000 | 00689nam a22002057a 4500 | ||
---|---|---|---|
005 | 20180605100054.0 | ||
500 | _aMengandungi Indeks | ||
650 | 0 |
_aConstruction Industry _xManagement |
|
264 |
_aPulau Pinang _bPenerbit Universiti Sains Malaysia _c1993 |
||
082 | _a658.4032 | ||
100 | 0 | _aHARRIS, Robert B. | |
300 |
_axiii,405p. _bil. _c24sm. |
||
650 | 0 | _aNetwork Analysis (Planning) | |
008 | 060823 #g# #0 0Mayu | ||
020 |
_a9838610313 _cRM45.00 |
||
090 | _aM 658.4032 HAR | ||
245 | 1 | 0 |
_aTeknik-teknik perangkaian anak panah dan keutamaan untuk pembinaan _cKAMARUDIN Mohd. Nor (ed.) |
942 | _cBUK | ||
999 |
_c126513 _d126513 |